Week of 12/13: System status NORMAL. To check individual assets and information, visit ioos.us and/or the Environmental Sensor Map.

The NOAA’s U.S. Integrated Ocean Observing System Office proposes to allocate federal funds to the Southeast Coastal Ocean Observing Regional Association, one of 11 regional coastal observing systems that comprise U.S. IOOS®, for the installation and maintenance of an oceanographic high frequency radar station.  HFR measures the speed and direction of surface currents in the ocean up to 200 km from shore.  Surface current data is important for public safety, aiding search and rescue operations, tracking offshore material spills, and monitoring water quality.  SECOORA — through a subcontract with the Florida Institute of Technology, a private, not-for-profit, research-intensive university located in Melbourne, Florida — plans to install this station at Hightower Beach Park in Satellite Beach, Florida.

The HFR consists of 12 single monopole antennas. The system will operate at 13.5 MHz. Signage will be installed at Hightower Beach Park to inform visitors about the radar system. To learn more about HFR and its uses, visit: https://hfradar.ioos.us/.

This notice announces the start of the scoping process that the U.S. IOOS Office will use to gather input from the public and interested agencies about the project.  The U.S. IOOS Office will prepare an environmental assessment that will discuss the environmental impacts of the installation of the HFR station proposed by SECOORA & FIT.

The National Environmental Policy Act requires the U.S. IOOS Office to take into account the environmental impacts that could result from a proposed action. In the assessment we will discuss impacts that could occur as a result of the construction and operation of the planned project under these general headings:

  • geology and soils;
  • land use;
  • water resources, fisheries, and wetlands;
  • cultural resources;
  • vegetation and wildlife;
  • air quality and noise;
  • endangered and threatened species;
  • public safety; and
  • cumulative impacts.

We will also evaluate possible alternatives to the planned project or portions of the project, and make recommendations on how to lessen or avoid impacts on the various resource areas. The environmental assessment will present an analysis of the issues and the U.S. IOOS Office will publish and distribute the Draft  Environmental Assessment for  public comment on the Federal Register.

If you have comments or questions about the project at this time, you can submit them to the U.S. IOOS Office via email at hightowerbeachpark@noaa.gov.

Contact

U.S. Integrated Ocean Observing System
1315 East-West Highway 2nd Floor
Silver Spring, MD 20910

(240) 533-9444

Privacy Policy  |  Disclaimer  |  Contact Webmaster  |  Survey  |  Information Quality  |  FOIA  |  EEO

Website Owner: National Ocean Service  |  National Oceanic and Atmospheric Administration  |  Department of Commerce  |  USA.gov

indicates a link leaves the site. View our Link Disclaimer for more information.